Copyright © 2012 - 2017 浙(zhè)江開山牌空(kōng)壓機 All Rights Reserved 浙ICP備2021026901号-1 www.sooq.cc版權所有:浙江開山壓縮機股份有限公司(sī)
空壓機(jī)的停用在各個單位都常有發(fā)生。那(nà)麼在初次開(kāi)機前(qián)空壓機停放時間超過三個月或空壓(yā)機停用時間超過三個月,再次(cì)開機前需要采取有(yǒu)效措施,bi須先請專業空壓機人員對機器進行保養檢測,制定安全措施,避免開機後發生不(bú)良狀況。
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先檢查電路狀态(tài),是否正常供電,電壓是否(fǒu)穩定;測量電動機絕緣電阻,數值大(dà)于1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢(jiǎn)查空壓機(jī)配件上是否含有積水,灰塵,及(jí)時清理。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進氣口,出氣口(kǒu)全面(miàn)檢測,防止發生堵塞現象
3. Overall inspection of intake and outlet to prevent blockage
4、在上(shàng)述都已經完成(chéng)的情況可以接通電(diàn)源,查(chá)看電腦控制器是否正常運(yùn)行(háng)
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換三濾和潤(rùn)滑油。因為在長期(qī)不(bú)用的情況下,三濾,油可能發生老化現象,從而造成空壓機開機運行時間不長即結膠積碳或堵(dǔ)塞,油路不暢使空壓機主機或其他零部(bù)件損壞。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業人員試(shì)機,電路改造後人工(gōng)控制加載卸載,先空載運行10分鐘以(yǐ)上,檢測各項指标和震動、噪音等正常,再進行加載,查看各部件運(yùn)行正(zhèng)常即可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.